Two soil test pits with mounds of sandy soil in an open meadow beside a backhoe

Custom Home Builder Oakland Township, MI

On many lots in Oakland Township, Michigan, a county septic permit comes before the township's building permit, and homes sit back from lakes, streams and wetlands. We arrange the county permit early.
Rows of black septic chambers and white pipes laid in sand trenches behind a new home

Building In Oakland Township

Lots in Oakland Township tend to be larger, and many rely on a well and a septic system instead of public water and sewer.

We work alongside your architect or designer. They lead the design. We help make sure it fits the lot and the township’s rules, keep you informed at every step, and build it with care.

Oakland Township Requirements

Well And Septic

Most lots here are on a well and a septic system. We secure the county permit early, before design goes too far.

Lakes, Streams And Wetlands

Water shapes where a home can sit. We place the house and the septic field with it in mind from the first sketch.

Trees

Mature trees are a large part of what makes these lots. We plan the home around them and handle the tree permit.

Permits

We prepare the application, file it with the Building Department and see it through to approval.

While We Are Building

We keep to the township’s working hours and keep the site in order.

Taking Down An Old House

Replacing an older home? We handle the demolition permit and the utility, well and septic shutoffs.

This page is general information, not legal advice or an official answer. Oakland Township decides what is allowed on each property, and its rules change. For anything official, the Oakland Township Building Department is on (248) 651-6930.

Questions About Building In Oakland Township

Will a new home in Oakland Township be on a well and a septic system?

Many lots in the township use them. The township’s requirements list a septic permit from Oakland County before the township issues a building permit. We check what your lot has and arrange the county permit early.

How far from a stream, lake or wetland does Oakland Township place a new home?

The township sets this for each lot. Its guide lists at least 100 feet from a free-flowing lake or stream for a home and its septic field, and a 25-foot strip beside a wetland. We look at this with you early and confirm with the township.

What do the tree rules in Oakland Township say about clearing for a new home?

Tree rules are set by the township. As published, clearing outside the house area in a subdivision comes under the tree permit. We check what applies to your property with the township before any tree is touched.

How long does Oakland Township say a home permit takes to process?

The township says home permits take between four and six weeks to process. That is the township’s own estimate, and it does not include the time to prepare the drawings or to get the county’s septic permit.

Which days and hours does Oakland Township list for building work?

The township sets the hours. They are listed as 7 a.m. to 9 p.m., Monday to Friday.

This is general information, not legal advice or an official answer. Oakland Township decides what is allowed on each property. Sources: the Oakland Township pages linked above. Checked October 11, 2026.

How We Build Here

Custom Homes

A new home designed around how you live, built to a standard that still looks right years after move-in.
Learn More

On Your Lot

Already own a lot in Oakland Township? We build on it, from site evaluation and permits through final walkthrough.
Learn More

Design & Pre-Construction

Budgeting, scheduling and constructability review before anyone breaks ground, while changes are still cheap.
Learn More

Nearby Communities

Oakland Township is close to Rochester Hills, Rochester and Washington Township, where we also build.
See All Of Oakland County
Newly built custom home at twilight
Let's Talk

Building In Oakland Township?

Tell us about your lot, your drawings and your timeline. We will tell you what it takes to build it here.
Discuss Your Project